We are delighted to be working with Baumon Lyons and associates to develop options for the refurbishment of the Stephenson Memorial Hall, Corporation Street, Chesterfield. The team includes architect, structural engineer, mechanical & electrical engineer,acoustician, access consultant, quantity surveyor, theatre consultant, arts consultant, planning consultant, health and safety consultant with Tourism UK developing the business plan and options appraisal. The team has been asked to present a long list of options for the refurbishment of the Stephenson Memorial Hall initially, and then develop the preferred option to RIBA Work Stage 2 (RIBA Plan of Work 13).